Water Removal

ALH have developed a “Y” entry system to work along side camera inspection for the extraction of water.

The “Y” entry allows both camera and suction hose to entry the gas free, when water is found the pump can be activated and the water extracted. The water passed through the cyclone to remove any gas and water is drained though a ball valve at the bottom.